How It Works

From Lot to Keys in 7 Simple Steps

We've built modular homes for years. Our proven process eliminates the guesswork and delivers your home 30-50% faster than traditional construction — typically in 6-12 months.

Average timeline: 6-12 months
7-step modular home building process timeline
01
Day 1-7

Consultation & Pre-Qualification

Everything starts with a conversation. We'll learn about your investment goals, timeline, and budget. Then we'll get you pre-qualified through our lending partner in just 2 minutes.

What happens:

  • Free 30-minute strategy call
  • Discuss your investment goals and timeline
  • Review budget and financing options
  • Complete 2-minute pre-qualification
  • Receive preliminary loan terms

Outcome:

Clear understanding of your buying power and project scope.

02
Weeks 1-4

Lot Acquisition

Finding the right lot is critical. We'll help you identify buildable parcels, conduct site inspections, and verify zoning and utility availability. This is part of our comprehensive services. Meet Desmond, our Director of Acquisitions.

What happens:

  • Access our off-market lot database
  • Review parcels matching your criteria
  • Conduct up to 4 free lot inspections
  • Verify zoning and setback requirements
  • Confirm utility availability
  • Negotiate purchase terms

Outcome:

A buildable lot under contract with known costs.

03
Weeks 2-6

Financing Approval

With your lot identified, we finalize your construction financing. Our lending partner specializes in modular construction and understands the unique aspects of these builds. Explore financing options.

What happens:

  • Submit full loan application
  • Property appraisal and title work
  • Construction draw schedule setup
  • Final underwriting and approval
  • Loan closing coordination

Outcome:

Approved construction financing with clear terms.

04
Weeks 4-16

Design & Factory Build

Choose your home design and customize to your preferences. While you're finalizing details, the factory begins precision construction in a controlled environment.

What happens:

  • Select from available floor plans
  • Customize finishes and features
  • Engineering and permit drawings
  • Factory production begins
  • Quality inspections throughout build
  • Third-party certifications

Outcome:

A custom-designed home built to Florida Building Code.

05
Weeks 8-16

Site Preparation

While your home is being built in the factory, we're preparing your site. Foundation, utilities, and all necessary site work happens in parallel — saving you months.

What happens:

  • Site clearing and grading
  • Foundation design and construction
  • Utility connections (water, sewer, electric)
  • Driveway and access roads
  • Required inspections

Outcome:

A prepared site ready to receive your home.

06
Weeks 16-20

Delivery & Installation

Your home arrives on-site via specialized transport. Our crews set it on the foundation and begin the finishing work that turns modules into a complete home. Meet our construction partner.

What happens:

  • Coordinate delivery logistics
  • Set home on foundation
  • Join modules together
  • Complete roof and exterior
  • Connect utilities
  • Interior finishing work

Outcome:

Your home installed and connected on your lot.

07
Weeks 20-24

Final Inspection & Move-In

The final stretch. We coordinate all required inspections, obtain your certificate of occupancy, and hand you the keys to your new Florida home.

What happens:

  • Final walkthrough with you
  • Punch list completion
  • Final building inspection
  • Certificate of Occupancy issued
  • Utility accounts transferred
  • Keys handed over

Outcome:

A move-in ready home with all documentation complete.

Why Modular is Faster

Traditional construction is sequential — each step waits for the previous one. Modular construction is parallel — your home is being built while your site is being prepared.

Traditional Construction

9-12+ months typical timeline
Weather delays are common
Sequential construction phases
Multiple contractors to manage
Higher carrying costs

Modular with Florida Home Buy

6-12 months typical timeline
Factory build = no weather delays
Parallel construction saves months
Single point of contact
Lower total project cost